Home > Glossary > Charging infrastructure

Charging infrastructure

Charging infrastructure is a key element in the deployment and use of electric vehicles. It constitutes the system that allows vehicles to be connected to the electric grid to recharge their batteries. The availability of an efficient and widespread charging network is crucial for several reasons:

  • Breaks down range anxiety: A well-developed network reassures users that they can recharge their vehicle in a variety of situations (at home, at work, on the road), reducing the worry of running out of power and encouraging the adoption of electric vehicles.
  • Promotes sustainable mobility: By facilitating the adoption of zero tailpipe emission vehicles, the charging infrastructure contributes significantly to the reduction of air and noise pollution, especially in densely populated urban areas.
  • It is a bridge between the grid and the vehicle: It acts as a key link between the power distribution grid and the vehicle, making it possible to transfer the energy needed to operate the vehicle. This connection must be safe, efficient, and compliant with standards.
  • It integrates advanced technologies: Modern infrastructure can include smart systems to optimize energy flow management (smart charging), encourage integration with renewable energy sources (such as solar panels), offer additional services to users (such as booking charging points), and support remote management and diagnostics of stations.

Essential Components

For a proper and smooth charging process, the infrastructure consists of several elements:

  • Charging Station (or Charging Point): Represents the hub of the infrastructure. It is the physical unit that houses the electrical protection devices (switches, fuses), the user interface, and one or more electric vehicle-specific outlets. In some cases, it may also include other elements, such as an integrated charging cable, an information display, or a payment system. Stations can be public (accessible to all) or private (for exclusive use).
  • Energy Meter: A device that measures and records the amount of electricity consumed during charging. A distinction is made between a primary meter (which measures energy drawn from the general electricity grid and is often subject to utility-specific regulations) and a secondary meter (used to account for consumption specific to a charging point, such as in an apartment building or business).
  • Battery Charger (Integrated or External): The electronic equipment that converts electricity from the grid (in terms of intensity, voltage, and waveform) to match the vehicle's battery charging needs. In electric vehicles, the charger is often integrated (on-board charger), but for rapid direct current (DC) charging, external chargers are used outside the car, integrated into the charging station.

Mode and Time of Recharge

There are different charging modes, each with different characteristics and timing, influenced by the power delivered by the station and the capacity of the vehicle charger:

  • Level 1 (Slow Charging): Usually used in the household, it employs a standard outlet (in many countries a single-phase household outlet) and provides limited power (typically between 1.4 kW and 2.3 kW). Requires extended charging times, ideal for overnight charging (several hours for a full charge).
  • Level 2 (Standard/Accelerated Charging): Uses higher voltage connections (e.g., 230V single-phase or 400V three-phase in Europe) and specific outlets (such as Type 2). Offers significantly higher power outputs (from 3.7 kW up to 22 kW or more), reducing charging time (from several hours to overnight for a full charge). It is the most common mode for home charging with wallboxes, in the workplace, and at many public stations.
  • Level 3 (Rapid Recharge): Operates at high powers using direct current (DC) and specific connectors (such as CCS or CHAdeMO). It allows the battery to be recharged to 80 percent of its capacity in a relatively short time (about 20 to 60 minutes), depending on the power rating of the station (typically 50 kW to 150 kW). It is typically available at public charging stations located along major thoroughfares and in high-traffic urban areas.
  • Level 4 (Ultra-Rapid Charging): The most advanced technology, capable of delivering even greater powers (above 150 kW, up to 350 kW or more). It further reduces charging times, allowing 80% of the charge to be reached even in less than 30 minutes. This technology is becoming increasingly popular along highways and at strategic locations for long-distance travel.

The Current Socket (Connector)

The type of socket (or connector) used determines the power and charging mode supported by the vehicle and station. There are several socket standards globally, including:

  • Type 1 (SAE J1772): Single-phase standard used mainly in North America and Japan for AC charging.
  • Type 2 (Mennekes): Three-phase standard used mainly in Europe for AC charging.
  • CCS (Comb ined Charging System): A combined standard that integrates both AC charging (evolution of Type 1 or Type 2) and DC fast charging. There are two main variants: CCS Combo 1 (North America) and CCS Combo 2 (Europe).
  • CHAdeMO: DC fast charging standard developed in Japan.
  • Tesla Supercharger: Proprietary connector used by Tesla's rapid charging network.

Steps for Implementation

The installation of a charging infrastructure typically involves the following steps:

  • Assessment and Decision: Analysis of charging needs (domestic, public, business), evaluation of existing electrical installations (available power, type of connection), selection of ideal location for charging point based on intended use and local regulations.
  • Installation: Physical mounting of the charging station (wall-mounted, on column, grounded), electrical connection to the grid, installation of any additional protections, and verification of proper grounding. This step must be performed by qualified personnel.
  • Legalization and Approval: Verification that the installation complies with local electrical and zoning regulations, obtaining the necessary permits from the relevant agencies (e.g., the power grid operator, municipality, condominium administrator).
  • Commissioning: Activating and configuring the charging point, performing operational tests and testing it for safety and efficiency. In some cases, it may be necessary to register the charging point with the network operator or a management platform.